sampling design

Pre-inspection in Kazakhstan

Posted on Posted in No heading

From 16 to 20 January 2017 our staff have been made investigations on the site of the equipment for sampling and preparation of coal samples for process quality control material in one of the Cogeneration Power Plant in the Republic of Kazakhstan. According to the survey a preliminary list of the necessary equipment was formed. At the moment our experts are working on the installation of the technological scheme for the development of this project.